Environment
We tackle environmental and resource-related issues where we can take concrete action: at our sites. Here, we provide an insight into selected measures and where and when we have implemented them.
Environmental and resource-related issues also affect the ROTHENBERGER Group’s operational processes. On this page, we outline selected measures relating to energy and resource consumption at our sites.
For each measure, we provide – where available – the relevant site, the implementation period and reliable results, including a benchmark and the relevant timeframe.
"What we do today determines what our Group will look like tomorrow!"
Dr Sandra Rothenberger - Member of the Supervisory Board of ROTHENBERGER AG
Photovoltaic systems
Solar power has been generated at the ROTHENBERGER site in Kelkheim since 2020. The five photovoltaic systems, fitted with monocrystalline solar cells, were installed and connected to the grid by March 2025. Their total installed capacity is 1,424 kWp.
For the period from 1 January to 31 December 2025, Mainova has confirmed that ROTHENBERGER Werkzeuge GmbH will be purchasing electricity via the TÜV SÜD-certified ÖkoBasis product, which, according to Mainova, is based on 100 per cent green electricity from renewable energy sources.